Brings the Standard up to date and into reasonable alignment with AS 2124-1986. It is intended to cover contracts for equipment such as power station plant and similar heavy manufacturing and processing equipment, especially where the operation entails a significant period of time between placing of order, delivery of various components, assembly testing and commissioning. A variation of the Standard is being drawn up by the committee to cover supply only situations.
AS 2987 and 2988-1987 History
AS 2988-1987
$216.00 $432.00
AS 2987 and 2988-1987
$212.00 $424.00
More Standards PDF
AS 2362.16-2002
$11.00 $22.44
AS 2050-2002
$29.00 $58.08
AS 2362.24-2002
$13.00 $27.72
AS 2900.7-2002
$39.00 $78.54






