Brings the Standard up to date and into reasonable alignment with AS 2124-1986. It is intended to cover contracts for equipment such as power station plant and similar heavy manufacturing and processing equipment, especially where the operation entails a significant period of time between placing of order, delivery of various components, assembly testing and commissioning. A variation of the Standard is being drawn up by the committee to cover supply only situations.
AS 2987 and 2988-1987 History
AS 2988-1987
$216.00 $432.00
AS 2987 and 2988-1987
$212.00 $424.00
More Standards PDF
AS 5079.1-2003
$50.00 $101.64
AS 60068.2.30-2003
$29.00 $58.08
AS 5079.2-2003
$39.00 $78.54
AS 4001.2-2003
$29.00 $58.08