Please Note: This product is for internal reference only.
Brings the Standard up to date and into reasonable alignment with AS 2124-1986. It is intended to cover contracts for equipment such as power station plant and similar heavy manufacturing and processing equipment, especially where the operation entails a significant period of time between placing of order, delivery of various components, assembly testing and commissioning. A variation of the Standard is being drawn up by the committee to cover supply only situations.
Brings the Standard up to date and into reasonable alignment with AS 2124-1986. It is intended to cover contracts for equipment such as power station plant and similar heavy manufacturing and processing equipment, especially where the operation entails a significant period of time between placing of order, delivery of various components, assembly testing and commissioning. A variation of the Standard is being drawn up by the committee to cover supply only situations.
AS 2987-1987 History
AS 4910-2002
$353.00 $706.86
AS 2987 TO 2988-1987
$96.00 $192.00
AS 2987+2988-1987
$38.00 $77.00
AS 2987-1987
$212.00 $424.00
More Standards PDF
AS 2610.1-2007
$35.00 $71.94
AS 62217-2007
$31.00 $62.70
AS 62231-2007
$39.00 $78.54
AS 1391-2007
$39.00 $78.54













