Brings the Standard up to date and into reasonable alignment with AS 2124-1986. It is intended to cover contracts for equipment such as power station plant and similar heavy manufacturing and processing equipment, especially where the operation entails a significant period of time between placing of order, delivery of various components, assembly testing and commissioning. A variation of the Standard is being drawn up by the committee to cover supply only situations.
AS 2987 TO 2988-1987 History
AS 4910-2002
$353.00 $706.86
AS 2987 TO 2988-1987
$96.00 $192.00
AS 2987+2988-1987
$38.00 $77.00
AS 2987-1987
$212.00 $424.00
More Standards PDF
AS 1774.28-1998
$25.00 $50.16
AS 3844-1998
$35.00 $71.94
AS 1289.6.4.2-1998
$18.00 $36.30
AS 4041-1998
$93.00 $186.12